What we do

Four routes.
One outcome - the permit in hand.

Most people arriving here do not yet know whether their file is an ordinary application, one that needs a relaxation, or the regularisation of something already built. That difference sets the documents, the cost and the wait.

3D model of a modular building representing the building permit services

Which route your file sits on

The route follows from the gap between three facts, not from project size: what the zoning plan (תב"ע) allows, what earlier permits used, and what a licensed surveyor finds on site.

The three decision rules

  1. If unused rights remain and the built matches the existing permits, this is the building rights route: work starts with the balance calculation, not with drawing.
  2. If a structure or use exists without a permit, or departs from what was approved, the file goes to legalisation, even alongside a new addition.
  3. If the design exceeds the plan in quantity, a relaxation (הקלה) is needed; if it changes the designation, that is non-conforming use (שימוש חורג). Both need publication and a window for objections.

The check needs a land registry extract (נסח טאבו) and the permit history, not an architect. Where the old permits were never scanned into the authority's digital archive, searching the physical archive adds one to three weeks.

What separates the four routes

What decides cost and time in practice. Ranges shift between authorities and between local planning and building committees (ועדה מקומית).

RouteWhat decides if it is possibleWhat lengthens itWhere it falls in the 7-45 working day range
Building rightsRights left in the plan, less what earlier permits usedA dispute with the examiner over how areas are countedLow end, unless a relaxation is needed
Planning and permitsWhether the concept fits setback lines, height and the information file (תיק מידע) conditionsA coordination round between structural, fire and drainage consultantsMiddle, longer when the information file adds an unpriced consultant
LegalisationWhether the built reconciles with the applicable plan, or needs a relaxationThe gap between the current survey and the original permit drawingsHigh end, and past it where enforcement is open
Fast-track permitsA defined scope, no relaxation, no objection expectedOne missing document, returning the file to the back of the queueLow end, if the file is complete on filing day

When the file sits on two routes

Many files are not one clean route. The common pairing is an old deviation and unused rights on one plot: a balcony enclosed years ago, beside a remaining allowance for a safe room (ממ"ד).

One application that regularises the old and adds the new saves a second fee, a second information file and another wait in the queue, but it ties the two together: a demanded change to the old part holds the new part.

The decision rule

If the legalisation reconciles with the applicable plan without a relaxation, file once. If it needs a relaxation, or enforcement is open, split them so the clean part does not queue behind the contested one.

That is settled before the survey is ordered, because the scope differs: legalisation documents the whole existing situation, levels and distances from the boundaries included, while an addition alone can use a focused survey. A surveyor booked for the narrow scope and later asked to complete it charges again.

3D cutaway of a lit residential building

Why this works

Most permit delays are not caused by the design - they are caused by the file: a missing document, a consultant who was never coordinated, a survey that contradicts the drawings. We assemble the file complete before submission, and answer the committee’s comments directly with the person who wrote them.

  • A free initial feasibility check - an honest answer before you invest
  • Consultants coordinated with each other, not only with you
  • Committee comments answered in days, not weeks
  • A realistic timeline set by request type and local authority

Get a feasibility check

What gets checked before the route is set

  • Pull a current land registry extract and confirm the registered rights holders, because shared ownership needs consents before filing, not during review.
  • Collect every earlier permit on the property with its approved drawings, and set those against what stands on site today.
  • Read the zoning plan and calculate the balance of rights, not the percentage a neighbour quoted; the method is in our guide to calculating building rights.
  • Check whether the plot needs another body's approval, such as a declared antiquities zone, because that must start moving in week one, not month three.
  • Order a current survey and set it against the permit drawings, so deviations surface before the examiner finds them.
  • Mark which consultants the information file conditions oblige, so no missing opinion appears mid-review; the document is explained in our information file article.
  • Establish whether supervision or enforcement is open, because that changes both the order of the work and its urgency.
  • Identify the neighbours a future relaxation would be published to, and judge the likelihood of an objection before publication, not after.

What sets the timeline

A timeline breaks in three places, and two sit before the committee sees the file.

Preparation, before filing

Two to six weeks usually pass between the decision to start and filing. The low end holds when the permit is already scanned and a surveyor is free that week; the high end is set by consultant numbers, co-owners' signatures, and an information file returning with a condition to check.

Review, after filing

From filing to permit, most applications we submit run 7-45 working days. The spread is not random: each round of examiner comments returns the file to the queue, so a reply sent two days late can cost a week. The range varies between authorities and between busy and quiet periods.

Publication and objections

A relaxation or non-conforming use must be published, followed by a period for objections. Careful work does not shorten that period, only brings it forward: publish once the route is settled, not once the design is finished. The stages are set out in our permit timeline article.

The numbers behind the routes

The figures refer to applications we submitted to authorities across Israel, not to the field as a whole.

96% of our submissions were approved. That figure is measured after a feasibility check in which we say when there is no route, so a file that cannot be approved is never filed.

A permit within 7-45 working days is a range, and the distance between its ends is mainly request type and authority: a defined scope with no relaxation tends low, a relaxation, objection or legalisation tends high, and committee workload moves it either way.

Over 15 years and over 1,250 clients translate into one practical thing: knowing what each committee actually asks for, which is not always what the form says. The same request draws an appendix in one city that nobody asks for next door.

We work nationwide, filing with local committees from north to south, and the initial feasibility check carries no cost. Call 072-3944444 or email office@heterim.com with a land registry extract and an exact address.

What the quote covers

Our fee is not the only cost, and that split is a common source of surprises. Three payments sit outside it: licensing fees to the authority, the surveyor, and the consultants the information file obliges.

Fees derive from the built area applied for and vary between authorities, so they can be estimated but not quoted in advance. Legalisation sometimes adds a betterment levy (היטל השבחה), set by valuation and able to exceed every other cost in the file, which is why we flag it at the feasibility check rather than at filing.

What is needed from you, and when

  • A decision on project scope before the survey is ordered; a later change means a second survey and a further payment.
  • Availability for the surveyor's visit, usually the first item to hold up preparation.
  • Signatures from every registered rights holder where ownership is shared.

The rest is ours: the information file, the consultants and their coordination, filing, and answering comments with whoever wrote them. The full list is on the required documents page, the order of work on the process page.

Questions and answers

The scoping call checks three things: what the zoning plan allows on the plot, what earlier permits already used, and what stands on site today. The route falls out of the gap between them. Unused rights with sound construction lead to the rights route. A structure or use without a permit leads to legalisation, even where the planned addition is entirely lawful. A design exceeding the plan in quantity needs a relaxation, and one that changes the designation is non-conforming use. No prior design is required for this, only a land registry extract and the earlier permits.

Yes, and on a large share of projects they are. The usual pairing is a plot with an existing deviation that also holds unused rights. A single application that regularises the old and adds the new saves a second fee, a second information file and another wait in the queue, but it joins the two parts: a demand to change the old part delays the new one as well. So where the legalisation needs a relaxation, or enforcement is open, we separate the applications even at the cost of a longer overall process.

Collecting the documents and pulling the land registry extract, ordering the survey and coordinating the surveyor's visit, obtaining the information file and reading its conditions, selecting the required consultants and coordinating them with each other rather than only with you, assembling the file, filing it, answering the examiner's comments, handling objections if they arise, and completing the permit conditions through to signature. You get one contact who knows the file and knows at any moment what is missing and who is waiting for whom.

Pricing depends on request type, project size and local authority, which is why we publish no price list. Payment splits into three separate parts: our fee, the licensing fees paid directly to the authority and derived from the built area, and the payment to the surveyor and to the consultants the information file obliges. Legalisation files may add a betterment levy set by valuation. After the feasibility check, which carries no cost, you receive a fixed quote for our fee and an estimate for the rest.

Where the property's earlier permits are scanned and available, an answer in principle takes one to three working days from the moment we have a land registry extract and an exact address. Where the old file exists only in the authority's physical archive, that stretches by one to three weeks according to the backlog there. The answer at this stage is one of principle: whether there is a route and which one, not how many square metres will be approved. The precise figure follows the survey and the information file.

Comments are routine and not a refusal. The authority's examiner marks what is missing or contradictory, and the file waits for a reply. The effect on the timeline is not in the comment but in the response time: each round returns the application to the review queue, so two days of delay can cost a week. We go directly to the person who wrote the comment to establish what was meant, instead of guessing through a form and discovering in the next round that the correction missed the point.

Yes, mainly the order of the work. A letter from enforcement, a demand for an explanation or a stop-work order moves the file onto the legalisation route and puts it on an external clock we do not control. The first step is an accurate mapping of what was built against what was approved, before anything is answered in writing, because a reply sent without a survey creates facts that are hard to correct later. If a new addition was planned alongside, it is usually right to separate it so it does not stall behind the legalisation.